The Business Case for Agile Business Analysis


Before I address that question, let me begin by explaining just what I mean by Business Analysis (BA) and Business Analysts (BAs), by quoting the current definitions presented by the International Institute of Business Analysis (IIBA):

“Business analysis is the practice of enabling change in an enterprise by defining needs and recommending solutions that deliver value to stakeholders.” [1] (BABOK 3). A “Business Analyst” is simply “any person who performs business analysis tasks” [2]. Many (though not all) of the activities within BA overlap with RE, such as: Identifying Scope and Stakeholders, eliciting requirements, documenting requirements, validating requirements, resolving conflicts and managing requirements. So, in effect, the questions about whether Business Analysis has a future in agile – and what that future looks like – are also, to a large degree, questions about RE and its place within agile.

Those who have posed these questions to me have come from many places. Some belong to organizations that currently use BAs; they’re wondering whether it will make sense to continue to do so once they transition to agile. Some belong to agile teams who sense a potential benefit in including Business Analysts as they take on more demanding projects but are unsure how to integrate them – or even if it’s possible to do so. And sometimes the questions have come from Business Analysts who don’t even agree on the use of the term agile Business Analysis – as they see it as no different from good analysis practice. If you’ve wondered about any of these issues – or need to make the case to someone who does – read on.

What is Agile Business Analysis?

As its name (and definition) implies, agile Business Analysis is the love-child of two parents: Agile and Business Analysis. Figure 1, Agile and BA Time Lines indicates how these two approaches have co-evolved over a similar time period – with the items in green marking key points in agile development and the items in blue marking BA events. As the figure indicates, agile and Business Analysis trace their roots roughly to the 1980’s and ‘90s. Both were proposed as solutions to a problem that had been vexing software engineers at the time: A disproportionate number of software projects were deemed failures on every front. For example, the Standish Group 1995 Chaos Report found that “31.1% of projects will be cancelled before they ever get completed”, that “only 16.2% for software projects… are completed on-time and on-budget”, and indicated that “52.7% of projects will cost 189% of their original estimates”. [3] Business Analysis and agile development both attempt to improve this situation, but they proceed from different diagnoses.

Figure 1: Agile and BA Time Lines.

The Business Analysis Prescription

Business Analysis proceeded from the assumption that the root issue of project failures was a communication problem between the business and solution providers. This assumption stemmed from research into the root causes of project challenges – such as the finding that the top 3 causes cited related to deficiencies in communicating business needs to solution providers: Lack of User Input; Incomplete Requirements & Specifications and Changing Requirements & Specifications [4].

In response, IT professionals began to address this shortcoming by developing a ‘Business Analysis’ practice with the aim of improving the requirements process in organizations. (I was one of the people at the time defining and developing the BA profession, through my work with the pioneering NITAS BA program created by CompTIA and the US federal government, as the designer of one of the first university corporate education BA programs in the U.S. and as a reviewer for the IIBA.)
Business Analysis was to a large degree derived from System Analysis – but with the technical aspects of the role removed and with other responsibilities related to Project Management added in, such as Stakeholder Management and scope control. Because the new BA role was non-technical (you didn’t need to be able to code to be a BA), it opened up the practice to people without a technical background – so that today many BAs come from the business side, placing those with a deep understanding of the business in control of the IT requirements – a fundamental change for many organizations and one that has reaped great benefits.

Today there is no question that improving the practice of Business Analysis improves project outcomes. One of the most scientifically rigorous studies of its kind, The Business Analysis Benchmark [5], was able to calculate a Requirements Premium – the added cost to a project attributable to poor requirements practices. It found that organizations using poor practices spent 62% more on similarly sized projects than organizations using the best requirements practices [6] (See Figure 2, Business Requirements Premium). Moreover, the study found that every measure studied improved as Requirements Discovery and Management maturity improved. (See Figure 3, Benefit Vs. Requirements Maturity Level.) Furthermore, according to the Standish Chaos Report 2015, 3 of the top 10 factors cited for project success are addressed by Business Analysis: User Involvement (which includes user feedback, requirements review, basic research, prototyping, and other consensus-building tools); Clear Business Objectives (which entails a common understanding of all stakeholders and participants in the business purpose for executing the project and aligning the project to the organization’s goals and strategy); and Optimization (a structured means of improving business effectiveness) [7]. One of those factors is also, unsurprisingly, the Agile Process – the other proposed prescription for the challenges facing projects.

Figure 2: Business Requirements Premium. [Source: Ellis, Keith. Business Analysis Benchmark[8]]
Figure 3: Benefit Vs. Requirements Maturity Level. [Source: Ellis, Keith[9]]

The Agile Prescription

Agile proponents hypothesized that the root cause of project failures and challenges lay in the software development process itself – specifically, the ‘Waterfall’ lifecycle that was dominant at the time (and is still in fairly wide use today). Waterfall seeks to control scope and reduce rework by requiring each phase in the development process to be performed completely before the next step is allowed to proceed. Agilists have long noted an inherent flaw in this process: Since it demands that a thorough analysis and design be completed before the business sees any working code, it results in a long lag between the baselining of requirements and their eventual implementation. During that time, business needs and priorities are likely to change, with the result that the solution often fails even when it ‘meets the requirements’. To correct this flaw, agilists proposed replacing Waterfall with empirical process control – a trial and error process that uses repeated cycles of intervention and observation to arrive at a desired solution. A number of approaches were proposed and practiced in the 1990s – and these culminated in a meeting in 2001 that resulted in the formation of the Agile Alliance and a set of guidelines – the Agile Software Development Manifesto [10] – giving us the basis for what we refer to today as ‘agile’.

Today there is no question that agile is widespread and that it’s working. A 2016 survey found that agile adoption has “crossed the chasm and is in the early majority stage, most organizations are using agile techniques for at least some software development projects… and those who have made the mind-set shift, coupled with strong technical practices, have definitely seen measurable improvements in time to market, product quality and customer satisfaction” [11]. As I’ve noted, the same Standish Group 2015 Chaos Report that reported BA-related factors for success also cited Agile Process. And it provided positive metrics for agile initiatives across all project sizes: more agile projects were successful than Waterfall, fewer agile projects were challenged and fewer failed.

With respect to productivity, a QSMA study in 2015 found that ‘Agile projects experienced a 16% increase in productivity compared to [the] industry average’ [12]. (Productivity was measured as an aggregate of tooling and methods, technical difficulty, personnel profiles, and integration issues.) It should be noted that this productivity gain, while good news, does not match the far more extravagant claims made when Scrum was introduced – at which time the authors declared, “When we say Scrum provides higher productivity, we often mean several orders of magnitude higher i.e., several 100 percents higher.’ [13] However, on the measure that most executives I have spoken to care most about – time to market – agile’s gains are more impressive: The same QSMA study found that “Agile Projects are 37% Faster to Market than [the] Industry Average”. [14]

Two Solitudes

A Tale of Two Solitudes

With such a great track record for both BA and agile, you’d think that merging the two would be a slam-dunk. Although these two streams, agile and Business Analysis, got their start at around the same time they have been evolving in relative isolation from each other ever since, largely because they took root in different types of organizations: Business Analysis within large mainstream organizations and agile within tech startups. The two approaches began to bump up against each other when mainstream organizations started experimenting with agile approaches and, from the other direction, when the organizations and teams that were early adopters of agile began to grow to the point that they needed mature analysis tools to handle the complexities that came along with that growth.

These developments have brought the two solitudes of agile and Business Analysis together – and at the same time, provided the opportunity to birth a practice that inherits the synergistic benefits of its parents.

Not a Unicorn

What Does Agile Business Analysis Look Like?

What does this new practice look like? One thing it does not look like is a unicorn – a fanciful creature we are never likely to see. I mention this because many do believe ‘agile Business Analysis’ to be an oxymoron, due to the popular view of BAs as people that perform big upfront analyses and create reams of documentation – practices that are diametrically opposed to the ‘minimal documentation’ and ‘just-in-time’ ethos of agile. In fact, though, Business Analysis has always been about doing just the right amount of work for the context; it’s just that the context for BA until recently has almost always been hierarchical, mainstream organizations, addicted to heavy planning and project governance. Now that these organizations have opened themselves to agile approaches, the BA function in that context looks much different. It is characterized by:

  • Just-enough planning using light-weight tools such as the Product Canvas (to provide an overview of the Product and its rationale), the GO Product Road Map (for long-range planning) and Story Maps (for mid-term planning)
  • Emphasis on conversation to capture requirements with “just enough” documentation using informal techniques such as User Stories and Use Case 2.0
  • Light-weight requirement management processes based on the expectation of change.
  • Just-in-time requirements analysis elicited incrementally and iteratively over the course of a project – rather than all upfront.

The frameworks and approaches that feed into the Agile Business Analysis discipline include Lean Startup, Lean Software Development, Scrum, Kanban, SAFe and XP as well as techniques developed by practitioners such as Richard Lawrence and Jeff Patton. Guidance related to the practice of agile Business Analysis can be found in a number of publications including the IIBA’s Agile Extension to the BABOK® Guide [15], User Stories Applied by Mike Cohn, and Agile Software Requirements: Lean Requirements Practices for Teams, Programs, and the Enterprise (Agile Software Development Series) by Dean Leffingwell. (I am currently working on a practical guide, to be published by Addison-Wesley, that walks the reader through an end-to-end agile initiative while focusing on the BA function.)

BA as a ‘role’ within agile

While those with a BA competency are often found today on agile teams, they are not always called ‘Business Analysts’ (partly because many agile approaches look down upon specialized team roles of any kind). So aside from “Team Analyst” and “Business Analyst” (called out explicitly in approaches such as DSDM), Business Analysis competencies are encompassed in a number of functions common within agile teams – such as the Proxy User (representing a user group), the Product Owner (many of whose responsibilities overlap with Business Analysis), and the Proxy Product Owner, who may be assigned to act in place of the Product Owner when there are not enough business stakeholders to go around. (See Figure 4 The BA mapped to agile functions, for an overview of agile positions that involve agile BA competencies.)

Figure 4: The BA mapped to agile functions.

The Agile BA Track Record

We have seen that organizations that develop either an agile or a BA proficiency stand to benefit. What happens when they do both? The research shows that agile organizations that invest in developing a mature requirements discipline significantly improve outcomes. Figure 5, Per Cent Projects Successful Vs. SDLC and Requirements Maturity Level indicates how project success rates increase with requirements discovery and management maturity levels for all system development lifecycle approaches, including agile. In fact, the chart indicates a success rate that more than doubles when agile teams develop high requirements discovery and management maturity levels vs. those that maintain poor requirements levels.

Figure 5: Per Cent Projects Successful Vs. SDLC and Requirements Maturity Level. Source: Ellis, Keith[16]

10 Reasons It’s Worth Investing in Improving the Agile Business Analysis Competency within Your Agile Teams

We’ve seen that the research indicates that an agile team that improves its BA practice stands to gain impressive benefits with respect to project outcomes. What that research does not parse out is exactly why this is so. Over the years I’ve worked with many agile teams as they’ve matured their BA practice. In many cases, they had started out with agile coaches who didn’t spend much time on requirements analysis issues. The teams got by for a while with a bare-bones analysis approach, using a simple list of requirements units (typically referred to as User Stories) and planning no more than the next two weeks in advance. Inevitably, however, they encountered problems as they took on greater challenges – problems that led them to grow their agile BA practice and ultimately, to improve project outcomes.

These, then, are the Top 10 Reasons that these teams have found that they needed to go beyond a ‘bare-bones’ approach to analysis and develop a mature agile BA competency:

Analyzing complexity

1: When the business problem itself is complex, a bare-bones approach doesn’t cut it.

Symptoms: Initiatives characterized by transformative change, complex business rules and/or complex process workflow

When the business problem itself is difficult, the analysis will be difficult as well – regardless of the development methodology. Unfortunately, the adoption of agile does not do away with the need to understand and communicate complex business rules, business processes, data attributes etc. – areas that have been addressed successfully by Business Analysis for many years and that remain useful in an agile context. Agile teams – even those in non-traditional, new-technology businesses – begin to face these issues as they mature and take on more difficult and long-term initiatives such as those characterized by transformational change, process re-engineering, or any technological change that is likely to impact complex business workflows. When agile teams are faced with business complexity, they need to on-board many of the traditional techniques of Requirements Engineering – such as process and domain modeling – but in a way that adapts them for the lightweight, just-in-time, iterative approach of agile.

2: In some important ways, Business Analysis can be even harder in agile than in Waterfall.

Symptoms: Difficulties decomposing requirements for agile (‘Story Splitting’); challenges mapping requirements (Stories) to iterations; recurring ‘bottlenecks’ of requirements units (User Stories) reaching Testing stage near the end of an iteration.

In fact, teams are finding that the need for a mature Business Analysis competency not only remains but can actually increase when an organization transitions to an agile process – because in some important ways, Business Analysis is actually harder to do in an agile environment than it is in Waterfall. One key aspect of agile is that it’s iterative – which means that it involves many iterations of the analysis-design-code-test cycle. From a requirements analysis perspective, this means that the analysis is spread out over the course of numerous passes, rather than being performed all upfront, as it would in a Waterfall process. There are big benefits to doing analysis iteratively, but it also introduces questions that don’t come up on Waterfall projects, such as: When should we analyze business rules? When do we specify tests? When do we do a deep dive on which aspects of the user requirements? The answers to these questions matter, because analyzing requirements too soon or too late introduces costs – and also because on complex projects, we often need to coordinate with other teams that have long planning timelines.

Another reason business analysis can be harder in an agile environment is because it’s incremental. In many agile implementations, this means that the requirements need to be segmented into requirements units that each add an increment of value to the customer. (This is sometimes referred to as Story Splitting. The term refers to the ‘splitting’ of big requests – called epics – into smaller requirements units, referred to as User Stories.) One team, for example, found themselves in a conundrum: any requirement unit (User Story) they designed that was small enough for agile (because it could be implemented comfortably within an iteration) was inevitably too insignificant to add value to the customer. Another team kept finding that its requirements units (User Stories) were often estimated to take almost an entire iteration to implement – and that this left no safe window in case of overruns, while creating a backlog for QA. As these examples show, requirements management in an agile environment can present challenges that don’t exist in ‘traditional’ analysis contexts and call for agile BA competencies (such as being able to decompose requirements into units optimized for agile) that we don’t often find on a team unless we make an effort to include them. (The Scrum Guide makes a passing reference to this reality in relation to the “particular domains that need to be addressed like testing or business analysis.” [17])

Agile BA Compensates for Lack of Resources

3: Agile BA helps compensate for lack of sufficient human resources from the business side

Symptoms: Product Owners/Customers on agile projects are overworked, shared across teams or lack necessary requirements competencies

One of the most consequential aspects of agile is that it requires a substantial commitment from business stakeholders – with the result that there are often not enough Product Managers and business Subject Matter Experts (SMEs) to go around. Agile BAs can provide valuable requirements-related support for these overworked stakeholders.

Coincidentally, as I am writing this, I have just heard from one of our consultants working on a gig with a federal government agency. I asked him how an agile transformation was going there and he told me things were great and that the business side was totally sold on agile. I was pleased to hear that – but much less so once I heard the reason: they believed that agile would mean less work for them (likely due to what they’d heard about agile’s preference for lean requirements documentation). This disturbed me because (as anyone who has been through an agile transformation knows) agile does not mean less stakeholder involvement – it means more – more stakeholders for more time: more stakeholders – because agile approaches typically require about one dedicated business-side decision-maker (the ‘Product Owner’ in Scrum or the ‘Customer’ in XP) for each team of about 7 people; and more time because stakeholders’ time is not just needed at the beginning and end of a project (as it is, largely, for Waterfall) but throughout the initiative. That adds up to a lot of business decision-makers tied up with development for long stretches – and there often just aren’t enough of these people to go around. In fact, many organizations find they only have about 1 such person (e.g., Product Manager) for every 2-4 teams. I’ve seen many different solutions to this problem – including the Proxy Product Owner, the rotating Product Owner/Customer (business SME dedicated but for a brief period of time), and the Product Owner who is shared amongst a number of teams. None of them, however, change the underlying math: insufficient business resources for the required work. Agile BA practitioners (whether or not as a dedicated role) support overworked Customers in carrying out the requirements-related aspects of their roles.

4: Customer/Provider Relationships that are primarily contractual require more comprehensive requirements documentation than collaborative relationships.

Symptoms: Off-shore development, other 3rd party development; corporate governance requirements

Agile presupposes a collaborative relationship between Developers and the Customer – one that does not require specific, contractual obligations with respect to what functionality will be delivered when. In many situations – such as when the Customer is engaging a 3rd party solution provider – this is not a realistic expectation. For example, we work with a company that provides software services in India to U.S. companies. As offshore developers, their relationships with clients tend to be contractual rather than collaborative, and this means that they need to be able to provide comprehensive upfront requirements documentation detailing the features they will be obligated to implement. This is also true in cases where the solution requires a heavy upfront financial commitment from the business – such as the purchase of a COTS (Commercial Off-The-Shelf) software system – and in situations that lock the business into a long-term relationship with a given Service Provider or 3rd party developer. Since the financial commitment is primarily upfront, it dictates that much of the analysis must be so as well.

The documentation in these cases is not ‘waste’; it acts as the basis of a contract and protects the interests of the Customer in future arguments about whether certain requirements are in or out of scope – and therefore who is financially responsible for their implementation. A mature agile BA practice supports the business in the creation of these requirements artifacts to the level of detail required by the situation – and ensures that they are implemented as specified.

Coordinating multiple teams

5: Large initiatives with multiple teams require mature requirements management competencies

Symptoms: Agile front-end teams waiting for other ‘back-end’ teams to complete work they are dependent upon

Managing dependencies between requirements is one of the great challenges of agile in a large multiple-team environment because the requirements are constantly in a state of flux. It’s hard enough doing this when one team is involved – much more so when there are many interdependent teams. This was the case with one of the teams we worked with – tasked with developing a client-facing front end, but stalled because the team developing the back-end services they needed had delayed work on those requirements. At the heart this problem is a systemic failure to adequately manage and track requirements dependencies – and prioritize them in a way that serves the business. Agile business analysis provides a number of lightweight tools for addressing these issues, such as Rolling Look-ahead Meetings (which look beyond the next iteration for dependencies), Big Room Sprint Planning (where teams gather to the same location to plan their next iteration) and the sharing of team members – as well as traditional Requirements Traceability tables.

Inter-team communication problems are particularly acute when an initiative includes a mix of agile and Waterfall teams. This often results in a heterogeneous approach to requirements – with the agile team using User Stories while the others rely on Use Cases or some other more formal documentation approach. (Often these approaches are managed with separate requirements-engineering tools.) Agile Business Analysis provides the competency to easily move between the two approaches and the ability to convert artifacts from one form to another when needed.

An additional challenge in these circumstances is that Waterfall teams often work on a much longer timeline than the 1-2 weeks that is common for agile. This means that agile teams need to be able to plan much further ahead than the next iteration or two. Agile Business Analysis adds mid and long-term planning tools, like Story Maps and the GO Product Roadmap, to the short-term and iteration planning tools provided ‘out of the box’ by agile frameworks such as Scrum.

6: When there is a soft skills deficit on the Team, agile BAs fill the gap

Symptoms: Any time you wouldn’t put your Developers alone in the same room as the business.

I was just on the phone last week with a high-level exec for a US federal agency that is adopting agile. As we discussed upcoming work, he was bemoaning the fact that he wouldn’t dare put most of his developers in front of a business stakeholder. It was interesting for me – a former developer – to see how little things had changed in this respect from my days in the trenches. For many program and project leaders, this Soft Skills gap is reason enough to include someone with a BA competency on the team – even as they convert the organization to agile. These agile BAs provide ‘people skills’ that encompass facilitation, oral and written communication, negotiating and knowing when to ask the right questions.

7: Dispersed teams and customers require more business analysis

Symptoms: ‘Work from anywhere’ policies and national initiatives with dispersed teams requiring enhanced analysis techniques for requirements communication.

When teams are co-located and have many opportunities for face-to-face communication with each other and the customer, it’s possible to rely primarily on conversation to communicate requirements. But these conditions do not always prevail. It’s now common in large organizations for teams to be working from different locations, sometimes on different continents. Furthermore, in an attempt to lower real estate costs while providing employees with more choice, many companies have adopted flex-time, work-from-anywhere policies that mean that team members rarely meet together in person. These circumstances require more extensive and explicit requirements documentation than is typically provided by a bare-bones agile analysis process.

Agile BA provides a pathway from business goals to solution requirements

8: Agile teams are looking for guidance on an end-to-end approach for converting high-level business needs into detailed IT requirements specifications that does not ‘break the value chain’ – especially on major initiatives

Symptoms: Teams that are consistently satisfying system specifications but failing to meet high-level business objectives

Some teams find that they are able to capture the business-side objectives and needs, such as reducing voluntary churn, but stumble when it comes to converting those needs into solution requirements. The result is often that the solution requirements – and in turn, the solution itself – slowly drift away from their initial high-level business needs. These circumstances point to a break in the value chain from need to delivered solution. Agile Business Analysis helps avoid this break by providing a full requirements lifecycle pathway from high-level business goals down to the IT requirements.

9: Agile teams need better tools for managing stakeholder expectations and planning requirements analysis and implementation

Symptoms: Stakeholders become disillusioned when early releases of the product do not address their concerns.

Because agile is iterative, stakeholders rarely get everything they want in the first pass. Not only may they have to wait for some time, but in some cases, things may actually get worse before they get better due to temporary workarounds. Add to this the fact that many stakeholders – primed by years of Waterfall – believe that if something has not been implemented in the first rollout, then it will never happen – and you have a recipe for a potential ‘Expectation Management” nightmare. This was the situation facing one of our clients, as they prepared to phase in a new Geographic Information System used in many business processes and by many stakeholders. The organization had decided that there would be little budget for customization during the first iterations. Good stakeholder management required medium and long-term planning to enable teams to inform stakeholders when the requirements of each group would be implemented – and forewarn them about when to expect temporary workarounds. Agile Business Analysis brings a number of generic and ‘agile-specific’ tools to the table to help accomplish this: the GO Product Roadmap is a light-weight tool for planning the rollout of features over the long term; Use-Case Models and Process Maps help identify impacted users; Story Maps used in conjunction with Lean Startup principles help visualize when and where temporary workarounds will be required.

10: Agile BA supports strategic, data-driven Product Development

Symptoms: The organization needs to improve its use of behavioral data to determine where to target future investment in product and software development

Many organizations find that they’re building the solutions the customer has asked for – but not always investing in implementing the right product and service enhancements. A mature agile analysis practice extends the concept of agile development into the broader Product Development strategy by integrating LeanStartup principles and tools that test business assumptions early, so that investment can be targeted to the right features – based on real evidence in the marketplace.

Mainstream organizations: A ‘perfect storm’ of non-ideal scenarios for agile

If we look at the big picture for agile, the ideal context would be one that resembles a commercial kitchen: It’s run by a tight, small team whose members work in close proximity to each other; the team contains all the skills required to get the work done; most of the communication is informal and oral and very little needs to get written down; there is trust between the business side and solution provider; all teams on the initiative are agile; the planning horizon is fairly short; and customers – those paying for and eating the product – are in frequent face-to-face contact with the team.

A Perfect Storm

Most mainstream business environments are nothing like that. In fact, they are a witch’s brew of many if not all of the scenarios I’ve laid out above: Their teams are not co-located; their teams are not independent but part of larger initiatives with inter-team dependencies – and at least some (if not many) of these teams are not agile. And in many cases, despite a desire to ‘eliminate waste’, extensive documentation is still going to be required due to regulations, governance and accountability issues. Many of these organizations still want to be as agile as they can – but business constraints like these mean they need more than a simple approach to the way requirements are planned, elicited, documented, verified and managed. In situations like these, ‘agile Business Analysis’ acts like Polyfilla – filling in the gaps between the ideal context for agile and the one that actually exists on the ground for many mainstream organizations.

Acknowledgement

Images are original oil paintings by the author, Howard Podeswa. Photography by Toni Hafkenscheid.

References and Literature

  • [1] IIBA. Business Analysis Body of Knowledge v3. 2015. 2.
  • [2] IIBA. Business Analysis Body of Knowledge v3. 2015. 2.
  • [3] Project Smart. The Standish Group Chaos Report, Standish Group, 2014. 3.
  • [4] The Standish Group Chaos Report. Project Smart, 2014, 9.
  • [5] Ellis, Keith. Business Analysis Benchmark – The Impact of Business Requirements on the Success of Technology Projects”. Toronto, Canada: IAG, 2009. 2-3.
  • [6] Ellis, Keith. Business Analysis Benchmark – The Impact of Business Requirements on the Success of Technology Projects”. Toronto, Canada: IAG, 2009. Specifically, it found that an organization with best requirements practices spent on average $3.63 million on a project originally estimated at $3 million while an organization with poor requirements practices paid $5.87 million for a project estimated at $3 million – representing a 62% cost increase.
  • [7] As reported by the author, in the online article, “Standish Group 2015 Chaos Report – Q&A with Jennifer Lynch” https://www.infoq.com/articles/standish-chaos-2015
  • [8] Ellis, Keith. Business Analysis Benchmark – The Impact of Business Requirements on the Success of Technology Projects. Toronto, Canada: IAG, 2009. 8.
  • [9] From a file provided directly by the author on research for Business Analysis Benchmark – The Impact of Business Requirements on the Success of Technology Projects. Toronto, Canada: IAG, 2009.
  • [10] Highsmith, Jim. History: The Agile Manifesto. Web. Nov. 12, 2015. http://agilemanifesto.org/history.html
  • [11] Ben Linders, 10th State of Agile Survey, (InfoQ, 2016), http://www.infoq.com/news/2015/09/state-of-agile-survey accessed May 3, 2016.
  • [12] QSM Associates. The Agile Impact Report, Proven Performance Metrics from the Agile Enterprise. 5. Web PDF. Nov. 14, 2015. https://www.rallydev.com/sites/default/files/Agile_Impact_Report.pdf
  • [13] Schwaber, Ken and Mike Beedle. Agile Software Development with Scrum. New Jersey, USA: Prentice Hall, 2001). Print. viii.
  • [14] QSM Associates. The Agile Impact Report, Proven Performance Metrics from the Agile Enterprise. 4. Web PDF. Nov. 14, 2015. https://www.rallydev.com/sites/default/files/Agile_Impact_Report.pdf
  • [15] To download the extension, see http://www.iiba.org/babok-guide/Agile-Extension-to-the-BABOK-Guide-IIBA.aspx
  • [16] Ellis, Keith, from a file provided by the author on research for Business Analysis Benchmark - The Impact of Business Requirements on the Success of Technology Projects. Toronto, Canada: IAG, 2009.
  • [17] Schwaber, Ken and Jeff Sutherland. The Scrum Guide. 2013. 6. The context is Scrum’s rule that, regardless of the need for competencies like Business Analysis, Team members all have the generic role, Developer.

Comments (6)

  • From: Rick O'Brien
  • Date: 16. March 2017

Thank you for the well written and thoughtful article. I have seen instances where the logic is agile doesn't mention business analysts and therefore we don't need them lead to unfortunate personnel decisions. As you mention, agile and business analysis took root in two different cultures, one in small start-ups and the other in larger organizations.

IIBA's agile extension is a solid reference to help map and illustrate the huge overlap between business analysis frameworks and techniques with agile approaches.

Thanks for your comments. I agree that one of the primary reasons that Business Analysis is often overlooked in agile contexts is simply the fact that there is little mention of it in the many of the resources used by agile practitioners – such as the Scrum Guide. I am trying to do my bit to fill that gap with my upcoming book, and resources like the BABOK agile extension provide good overviews of the terrain. And most importantly, thanks to the efforts of practitioners such as yourself, this oversight is on its way to becoming a thing of the past.

  • From: Gareth Rogers
  • Date: 01. March 2017

Really good article. The vision of Agile and business analysis representing the two most important streams of development out of the software crisis which must now join together is a powerful one.

If one accepts then your reasons for developing BA competency - and in nearly all cases I would - it seems to me that there is inevitably a tension between on the one hand Agile's push to develop partial solutions delivering incremental business value and on the other hand the BA's desire to do a full analysis of the problem before committing to any particular solution path.

What are your thoughts on resolving this tension to ensure that requirements are in fact just enough and just in time?

In reply to: “it seems to me that there is inevitably a tension between on the one hand Agile's push to develop partial solutions delivering incremental business value and on the other hand the BA's desire to do a full analysis of the problem before committing to any particular solution path.”

I would agree that there is a tension between agile’s incremental approach and a natural tendency of both analysts and designers (like most creative people) to do a thorough and “proper job”. As one who has done both analysis and design – I can attest to the fact that there is great personal satisfaction in fully wrapping your head around a problem (upfront analysis) and in designing a comprehensive solution (big upfront design) – and that this indeed runs counter to the ethos of iterative incremental development. Not all tension is bad, though: I believe that this is creative tension that we should embrace. It’s a good thing. Why? Because it leads us to strongly challenge our reasons for wanting to do “big upfront” analysis and design and to delay work wherever there is no compelling reason to do it earlier. I would argue that we did not challenge these “upfront” inclinations well in the past, when this creative tension did not exist.

Here’s one example: In the old days, I used to create a complete upfront conceptual and technical data model before any code was written. Today, I would rarely do that: Yes, I’d do a high-level model that shows how systems connect, I’d make sure there were “proofs-of-concept” for any new/risky design mechanisms (e.g., for accessing the database) and I’d do a detailed analysis and design for the entities and other elements of the data model that are to be used in the early iterations. But I’d delay work on the other data elements until closer to their implementation time. By doing so, I can get software out the door sooner, and I don’t have to run the risk of re-doing parts of the data model when the business rules change – or even worse, of analyzing aspects of the business that we may never get around to implementing in the solution.

Here’s another example, close to one I’ve seen many times with our clients: A client is looking to replace an existing architectural system with a 3rd party solution. In “the old days”, I would have performed a detailed upfront workflow analysis for all business processes that used the system, in order to ensure that these processes and workflows would be supported by the new solution. Today I’d stage that analysis: I might begin with a high-level model (such as a Context Diagram, DFD and/or Communication Diagram) that shows how the business entities/systems need to be able to talk to and connect with each other - since that may be sufficient in order to short-list vendors. As I’m waiting for vendors to respond, I’ll use that time to develop a mid-level public process model that focuses on the hand-off points for each process. That model may be just enough to gain a commitment from the vendor that these more specific integration requirements would be supported by their solution. Now suppose that there is no budget for customization until later releases. In that case, I might delay work on the “private process models” (showing internal process steps) until the releases in which changes to those processes are to be implemented.

What’s the difference? Before, we BAs typically erred on the side of more upfront analysis in a desire to protect the client: the more we included in the requirements the less chance there was for the solution-provider to claim that something the client needed was “out of scope”. But the cost was a long lead-time before implementation and a lot of analysis that, by the time we were ready to implement it, proved to be unnecessary or out-of-date. Today, because of the influence of agile, we are more critical of pre-work: If we can’t demonstrate any value to doing it upfront, we delay it in order to shorten time to market and eliminate unnecessary work.

As for resolving this tension with some general guidelines for ‘just enough just in time’ requirements, here are four that I have found useful:

Just In Time Guidelines:

  1. Delay requirements analysis activity until the point where there would be an unacceptable cost in delaying it further. (This guideline is derived from the Lean concept of Real Options.)

Examples of unacceptable costs are cases where any further delay:

  • would remove options from the table (e.g., because a deadline for a decision on an option will have been passed)
  • would leave insufficient time after the analysis activity to complete the implementation. E.g., If we don’t analyze a Story in a prior Sprint, we won’t have enough time to both analyze and develop it during the implementation Sprint.
  • would unacceptably stall other activities that are dependent on the analysis activity. E.g. If we don’t do some upfront analysis of a Story prior to its implementation Sprint, we won’t know enough about the Story to be able to estimate the effort it will require - a crucial input to the Sprint Planning activity at the start of its implementation Sprint.

2.As a general “rule of thumb” don’t spend more than 10% of the total time interval you are planning for on upfront planning and analysis.

3.To avoid delays caused by unexpected dependencies between teams, identify upcoming Stories and their dependencies two iterations prior to their expected implementation. (Why? If Team A identifies a Story that is dependent on features that Team B is responsible for, Team B’s first opportunity to implement it will be in the following iteration. In the iteration following that one, Team A will then be in a position to implement the Story. (This guideline is from Mike Cohn’s “Rolling Lookahead Meeting” guidelines.)

Just enough guideline:

  1. With regard to how much is just enough, simply ask yourself: What difference will it make to the final outcome if I don’t include this piece of requirements documentation? Will its inclusion change any decision that will be made down the road? If it won’t, leave it out. On the other hand, if the documentation will influence the outcome - and the cost is justified by the risk of not creating it - create it, keeping in mind the previous “just in time” guidelines for when to do so.
  • From: Dave
  • Date: 24. February 2017

Agile Appears to be a non-factor or negative factor. Requirements maturity seems to be the key.

Your Figure 5 seems to strongly indicate that it's not Agile that provides substantial benefits to project success, it's a higher level of requirements maturity. Indeed, at requirements maturity levels 1 and 4, Waterfall seems to significantly out-perform Agile when it comes to delivering project success. And at levels 2 and 3 where Agile is higher, the difference doesn't seem significant. And that at maturity level 4, Agile is actually the least successful of the four methods included in the chart.

Figure 3 would seem to support this as well. The process of delivering projects is not binary. 'Waterfall' and 'Agile' are not the only choices. So rather than arguing for "agile Business Analysis", your article seems to be more strongly arguing for just "good Business Analysis". And the project can use whatever SDLC model works best for their situation, whether that is Agile, Waterfall, or something different.

Re: “Your Figure 5 [bar graph of success rates vs. method vs. RDMM] seems to strongly indicate that it’s not Agile that provides substantial benefits to project success, it’s a higher level of requirements maturity …”

"The process of delivering projects is not binary. 'Waterfall' and 'Agile' are not the only choices. … And the project can use whatever SDLC model works best for their situation, whether that is Agile, Waterfall, or something different."

Ah, statistics. The devil is in the details. Firstly, thanks for your thoughtful comments. Let me begin with some general comments: The reason I like the study from which Figure 5 is taken is because it is one of the few that has carefully parsed out the Requirements Maturity impact from the effects of SDLC. I think the important ‘take-away’ from it is that - at least for the types of project represented in the study – the impact of Requirement Maturity on project success is stronger than the impact of SDLC. But I would be wary of drawing the broader conclusions you are suggesting about the benefits of agile (or lack thereof). Why? Well, I do agree with you that the graph (Figure 5), shows no significant benefit in terms of project success due to the use of an agile vs. Waterfall SDLC, but I don’t agree that it shows a negative one. To be specific, the data behind the graph (which admittedly, does a better job at illustrating changes due to requirement maturity than due to SDLC) show a slight average improvement of 1.8% across the maturity levels, with higher improvements for mid-level requirements maturities and slightly negative impacts at the extremes. Since these differences lie within the margin of error for the study, its finding is essentially, that there Is no discernable impact on project success for the projects in the study. So, does this mean that organizations should give up on agile? No. First, it’s just one study, and it’s dated. Other studies, such as the more recent Standish Chaos Report 2015 as well as the 2015 QSMA study cited in the article, do show a positive impact of agile.

Secondly, Figure 5 is from a study that only looked at big-budget, transformational initiatives – so it doesn’t have anything to say about other types of initiatives. It might indeed be true that projects of this type benefit less than smaller projects from agility and iterative development while paying a higher cost in terms of rework (“paying off technical debt”). I think the important thing to keep in mind is that, as you note, the choice is not binary – and the best choice, especially for large initiatives, is often a hybrid. In other words, I do believe SDLC is important – but you need the right approach for the right situation. So, for example, large projects like those included in the study often require much more upfront work than other projects - and especially so, if they involve the purchase of expensive 3rd party solutions - because the financial commitment (and the risk) is often also front-loaded and not incremental. Consequently, if the “agile” projects that the study looked at were rejecting this kind of upfront work in favour of a mistaken adherence to ‘pure agility’ we would expect that they would experience negative outcomes.

But finally, and most importantly, many organizations, even those working on large initiatives, are still pushing for an SDLC approach that is as ‘agile’ as possible for reasons other than the factor (% successful) examined in the figure. In my experience this often is not because they believe ‘agile’ will lead to more ‘successes’ (the metric measured in the study): they aren’t expecting the SDLC change to lead to lower costs for the same amount of features or a faster time to develop all of them. They are hoping agile will lead to a shorter time to market for the features that will have the most impact – allowing them to respond quicker to market challenges and opportunities and to government regulations. It is here that agile excels – but it can only do so if the business has good guidance in figuring out what those minimum features are (the “MMV/MMP”) – and in other aspects related to managing requirements in an agile context. That, in a nutshell is why I believe that a strong BA practice is required to fully realize the benefits of agile – and that this practice has to be one that includes competencies (such as MVP analysis) that are often beyond those of BAs who have only worked in Waterfall environments.

Re: So rather than arguing for "agile Business Analysis", your article seems to be more strongly arguing for just "good Business Analysis".

I am arguing (and the data concurs), that a team that has chosen agile will get significantly better results if it includes a mature business analysis practice in the mix. But I don’t agree that “rather than arguing for agile BA” I am “just” arguing for good Business Analysis. (If that were the case I wouldn’t be writing a book about it!)

As I wrote in the article: “Business Analysis has always been about doing just the right amount of work for the context; it’s just that the context for BA until recently has almost always been hierarchical, mainstream organizations, addicted to heavy planning and project governance. Now that these organizations have opened themselves to agile approaches, the BA function in that context looks much different”.

For some examples of how this is so, please see point #2 in the article, “In some important ways, Business Analysis can be even harder in agile than in Waterfall”. But to get across the gist of my argument, let me explain by way of analogy. Like “good BA practice”, we would all agree that “good English usage” is a worthy goal to aspire to for someone living and working in English. But what does that mean? Good English usage in the context of formal writing, such as the writing of contracts, is quite different from good English usage in the context of writing a novel or in the context of conversation – and it would be inappropriate to use the wrong form for the context. This is the case for BA practice. BAs experienced in Waterfall projects need to develop new competencies for planning when to analyze what (vs. all upfront), for defining effective MVP requirements, for splitting requirements into units small enough for incremental development, for managing requirements in an environment of constant change (no baselining) and for adapting pre-existing techniques for an iterative, light process (such as the adaptations in Use Case 2.0). Of course, we can say that this is all “good Business Analysis”, just as the various usages of English are all “good English” – but that’s not the point. They are not the same usages – and to be a good BA on an agile initiative you need to be proficient in the ‘agile’ variant of Business Analysis – not just the practices you may know from your experience on Waterfall projects. It is this retooling of Business Analysts and the BA discipline that I am advocating for in the article.

Author's profile
Related Articles
RE for Testers

Why Testers should have a closer look into Requirements Engineering

Read Article
Product Owner in Scrum

State of the discussion: Requirements Engineering and Product Owner in Scrum

Read Article
Toward Better RE

The Main Thing is Keeping the Main Thing
the Main Thing

Read Article